Summers Superchisel - 3-Section Manual de usuario Pagina 72

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 138
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 71
3-6
SECTION 3 – CHISEL PLOW OPERATION
FIELD OPERATION
1. Rephase cylinders before starting eld operation.
2. Choose a at spot in a eld to set tillage depth and level chisel plow.
3. Determine desired tillage depth by working test strips within the eld.
IMPORTANT!
The operator is responsible for adjusting machine since machine does not come “Field
Ready” from factory.
NOTE: Optimum performance of machine is achieved by tilling at a depth and moving at a
speed that does not go beyond limit of trip assemblies. This limit is exceeded if connecting
bolt (shown in the following drawing) continually rides above trip assembly cap.
IMPORTANT
TO REPHASE CYLINDERS, RAISE
MACHINE AND MAINTAIN HYDRAULIC
PRESSURE TEN SECONDS AFTER
CYLINDERS ARE FULLY EXTENDED.
QUICKLY RETRACT CYLINDERS AT
LEAST 1/2”. REPHASING SHOULD BE
DONE EVERY HOUR OF OPERATION TO
MAINTAIN UNIFORM TILLAGE DEPTH.
8Z0340
Vista de pagina 71
1 2 ... 67 68 69 70 71 72 73 74 75 76 77 ... 137 138

Comentarios a estos manuales

Sin comentarios